Skip to content
Free UK standard shipping on in-stock items
Free UK standard shipping on in-stock items

Flycam Flowline Master 180° with Placid Stabilizing Arm for Camera & Gimbals (5-12kg/11-26lb)

Save 16% Save 16%
Original price £1,226.14
Original price £1,226.14 - Original price £1,226.14
Original price £1,226.14
Current price £1,035.40
£1,035.40 - £1,035.40
Current price £1,035.40
SKU : FLCM-FLN-MSTR-PLA-01

AT A GLANCE


Payload
5-12 kg
Waist Hip Strap Length
Min-Max: 81cm - 125cm
Compatible With
Camera And Gimbals
Best For
Moving Shots
Vibration Reduction
Handheld Stabilization
Dynamic Camera Movement

Secure checkout | Fast delivery | 30-day returns | 1-year warranty

 
 

Makes Your Back Comfortable & Your Shots More Stable!

01.

OFFERS COMFORTABLE SHOOTING EXPERIENCE
Flycam understands the pain of Film-makers & brings you the most iconic combination of Flycam Flowline Master with Placid Arm.
The extended handheld camerawork can prove to be a backbreaker that would result in fatigue & distorted shots.
The Flowline takes the weight off your shoulders & arms and redistributes it across the entire back, and the Placid Arm absorbs the distortion & delivers silky smooth shots.
Note: It is recommended to attach the minimum required weight
5kg / 11lb for pulling down the balancing rope to ensure proper operation of your Flycam Flowline system.

Flycam Flowline Master 180° with Placid Stabilizing Arm for Camera & Gimbals (5-12kg/11-26lb)
Flycam Flowline Master 180° with Placid Stabilizing Arm for Camera & Gimbals (5-12kg/11-26lb)

02.

THE BEST STABILIZATION SYSTEM
The Flycam Flowline Master Vest ensures more support around the Shoulders and Back while accessing Cameras, Camcorders & Gimbals and lets you shoot comfortably for a longer duration.
At the same time, Flycam Placid is a 2-axis Spring Arm that attaches to the end of your Flycam Flowline, stabilizes and smoothens the shots while moving or running.
The Flycam Placid pivots around its axis and provides side to side stabilization along with Vertical Stabilization.

03.

CALIBRATE PRECISELY TO YOUR NEEDS
The Flycam Flowline adjusts to balance the load placed on the Support Rope by turning the knob present on the rig's back.
And the Placid Arm elements like the Interchangeable Spring Mechanism and the Easy Adjustment Knob lets you easily adjust its tension to balance the setup.

Flycam Flowline Master 180° for Camera & Gimbals (4-12kg/9-27lb) with Placid Stabilizing Arm
Flycam Flowline Master 180° for Camera & Gimbals (4-12kg/9-27lb) with Placid Stabilizing Arm

04.

MOST VERSATILE CAMERA SUPPORT RIG
This mechanical combination is a perfect solution for filmmakers. It lets you work in challenging locations for longer hours where you cannot use electronic equipment.
It allows you to be flexible & more creative in your shots; you can quickly take high & low shots with the help of this combination.

05.

THE INVESTMENT THAT LASTS
We know the Film-maker's life takes a toll on your gear. Yet this combination of Flycam Flowline Master with Stabilizing Placid Arm is built with the highest quality material.
The Placid Arm has been built using robust Aluminum Alloy. The springs used in this are made up of Stainless Steel which gives strength and stability.
And the Flycam Flowline Body Support Vest and Placid Arm is cleverly designed to guarantee it will work correctly and smoothly year in and year out.

Flycam Flowline Master 180° for Camera & Gimbals (4-12kg/9-27lb) with Placid Stabilizing Arm

IN-ACTION VIDEOS

FLYCAM FLOWLINE

Flowline Weight

  Complete 3.6 kg / 8 lb

Height

  Mounted: 100cm | 39.4inch
  Folded: 60cm | 23.6inch

Suspension Line

Material: 3mm Nylon
Length (Rope): 152.5 cm (60") when fully stretched

Top Bar

 Length: 560mm
 Rotation: 180°

Waist Hip Strap Length

  Min-Max: 81cm - 125cm (32inch - 49inch)

Tilt Range

  40° Up/ Down

Side to Side Movement

  180°

PLACID ARM

Construction

  Aluminum, Carbon Steel, Stainless Steel, EPDM rubber

Dimensions

   Height: 205mm
   Width: 395mm
   Depth: 65mm

Weight

  1.80 kg / 3.96 lb

Packing Dimensions (LxWxH)

  42 x 20.5 x 12cm

Packing Weight

  2.40 kg / 5.28 lb

IN THE BOX

  Flycam Flowline Placid Two Axis Spring Arm (FLCM-FLN-PLA)
  Flycam Flowline Master Professional Support (FLCM-FLN-MSTR-02)
  Bag


Guaranteed Fast Delivery
For all orders

Quick and Efficient
Customer service

Easy Returns
Up to 30 days

1-Year Warranty
On All Products





  • Is the placid already attached or does it need to be assembled after delivery?

    Yes, the placid is already attached.

  • How do i adjust the height?

    It has an optional height riser for vertical extension of the top bar.
    Here are the details: Flycam Height Riser for Flowline Body Support Rigs (SKU : FLN-HR-4)

  • What is the best way to attach this with old school news ENG camera and a DJI Ronin 2 ?

    If your camera is properly balanced with the Ronin 2 gimbal then yes, this setup will work with the master flowline. Please note the weight capacity of the master flowline is 4 to 12kg so your camera setup weight should be under it.

    You can make the easy & instant setup by holding the handlebar with the Flowline's Hook. Also, if using the ring of Ronin 2, then you can use it by holding it from the side.

  • Can the cable adjust length while in use or do I have to reposition the length and lock it off to a new length?

    You cannot adjust the length in the inbuilt setup, you have to remove the rope from the camera hook and set it as per requirement.
    Hence, when the setup is in place, you can use the knob on the backside to balance the payload you are applying.

Newsletter sign-up

You can subscribe without accepting optional cookies.

By selecting Subscribe, you agree to receive Proaim product updates and offers by email. You can unsubscribe at any time. Privacy policy

x

x