Skip to content
Free UK standard shipping on in-stock items
Free UK standard shipping on in-stock items

Flycam Flowline Professional Series 5-12kg / 11-26lb

Ergonomic Body Support for Camera & Gimbals

Save up to 36% Save 6%
Original price £469.31
Original price £464.05 - Original price £469.31
Original price £469.31
Current price £440.75
£294.73 - £469.31
Current price £440.75
SKU : FLCM-FLN-300N

AT A GLANCE


Payload
5-12 kg
Support Arm Rotation
360°
Waist Size
28 inch - 56 inch
Compatible With
Camera Support and Production Workflows
Best For
Production Support
On-Set Workflows
Equipment Organization

Secure checkout | Fast delivery | 30-day returns | 1-year warranty

 
 

01.

THE MOST COMFORTABLE SHOOTING EXPERIENCE
We understand extended handheld camerawork can prove to be a backbreaker. The Flycam Flowline takes the weight off your shoulders and arms and redistributes it across the entire back using the Comfortable and Breathable Body Harness.
Note: It is recommended to attach the minimum required weight for pulling down the balancing rope to ensure proper operation of your Flycam Flowline system

Flycam Flowline Professional Series 5-12kg / 11-26lb
Flycam Flowline Professional Series 5-12kg / 11-26lb

02.

THE FLOWLINE VEST
The Flowline Vest has Multiple Layers of Padding which ensures more support around the waist, allowing you to mount large setups and shoot for longer duration comfortably. It has a flexible belt system & adjustable vest rods on sides which will enable a comfortable fit for all body types.

03.

SMOOTHER STEADIER SHOTS!
The Harness takes the weight off your neck, arms and shoulders, letting you hold the camera steady for longer duration without fatigue, resulting in smoother and Steadier Shots. The Support Rope also adds a point of Contact which reduces Vibrations.

 Flycam Flowline Professional Series 5-12kg / 11-26lb
Flycam Flowline Professional Series 5-12kg / 11-26lb

04.

ADAPTIVE CAMERA SUPPORT RIG
This Flowline System has various options such as Flowline 300N, 400N, 500N, 600N and 750N and fits multiple Camera and Gimbal Setups between the weight range of 5kg/11lbs to 19kg/42lbs. You can choose the Flycam Model depending on the Payload you plan putting on it and it’ll self-balance that load using the Gas Springs integrated into the design.
The Height adjustable support bar enables you to adjust the height of the support arm according to your requirement. The top bar also allows for 360° rotation to capture shots with incredible freedom of movement.

05.

BUILT TO LAST
We know set life can take a toll on your gear. Built with the highest quality materials and custom-designed Gas Springs, the Flycam Flowline is sure to last you a lifetime. It comes in a high-quality protective bag that lets you easily carry it with you around the world.

Flycam Flowline Professional Series 5-12kg / 11-26lb

IN-ACTION VIDEOS

SPECIFICATIONS

FLOWLINE 300N

Load Capacity

Min-Max: 5kg - 8kg (11lb - 17.6lb)

NOTE: Using Placid (FLCM-FLN-PLA) or Edge V1 (FLCM-EDGE-V1) with this Flowline model will impact the minimum and maximum payload capacities.

Construction

  High‐Grade CNC Aluminum And  
  Fabric

Support Arm Rotation

  360°

Height

  Mounted: 43.5inch
  Folded: 27inch

Suspension line 

  107 cm (42'') when fully stretched

Top Bar Length

Flycam Flowline Professional Series 5-12kg / 11-26lb

Waist Size

  28” to 56”

Extension Length

Flycam Flowline Professional Series 5-12kg / 11-26lb

Dimensions

Flycam Flowline Professional Series 5-12kg / 11-26lb

Product Weight (without packing)

  4.4Kg

Product Volumetric Weight (With packing)

  23.4Kg

FLOWLINE 400N

Load Capacity

Min-Max: 8kg - 10kg (17.6lb - 22lb)

NOTE: Using Placid (FLCM-FLN-PLA) or Edge V1 (FLCM-EDGE-V1) with this Flowline model will impact the minimum and maximum payload capacities.

Construction

  High‐Grade CNC Aluminum And  
  Fabric

Support Arm Rotation

  360°

Height

  Mounted: 43.5inch
  Folded: 27inch

Suspension line 

  107 cm (42'') when fully stretched

Top Bar Length

Flycam Flowline Professional Series 5-12kg / 11-26lb

Waist Size

  28” to 56”

Extension Length

Flycam Flowline Professional Series 5-12kg / 11-26lb

Dimensions

Flycam Flowline Professional Series 5-12kg / 11-26lb

Product Weight (without packing)

  4.4Kg

Product Volumetric Weight (With packing)

  23.4Kg

FLOWLINE 500N

Load Capacity

Min-Max: 10kg - 12kg (22lb - 26.4lb)

NOTE: Using Placid (FLCM-FLN-PLA) or Edge V1 (FLCM-EDGE-V1) with this Flowline model will impact the minimum and maximum payload capacities.

 

Construction

  High‐Grade CNC Aluminum And  
  Fabric

Support Arm Rotation

  360°

Height

  Mounted: 43.5inch
  Folded: 27inch

Suspension line 

  107 cm (42'') when fully stretched

Top Bar Length

Flycam Flowline Professional Series 5-12kg / 11-26lb

Waist Size

  28” to 56”

Extension Length

Flycam Flowline Professional Series 5-12kg / 11-26lb

Dimensions

Flycam Flowline Professional Series 5-12kg / 11-26lb

Product Weight (without packing)

  4.4Kg

Product Volumetric Weight (With packing)

  23.4Kg

IN THE BOX

Flycam Flowline Professional Series 5-12kg / 11-26lb
Bag

delivery

Guaranteed Fast Delivery
For all orders

customer service

Quick and Efficient
Customer service

easy returns

Easy Returns
Up to 30 days

warranty

1-Year Warranty
On All Products





  • What body sizes it will fit to?

    It will fit to all body sizes from 28� to 56�.

  • What is the weight of the Flowline?

    The Flycam Flowline itself weighs 4kg.

  • Will this work with my easyrig model?

    Yes, this will work with your easyrig model. You just need to drill a hole for mounting the placid arm onto your rig.

  • Is it returnable for a full refund if it doesn’t meet my expectations upon delivery?

    Yes, absolutely. We always backup our sales. In case, you don't like the product, we take it back within 30 days and you get a 100% refund.

  • Does this come with the shoulder rig?

    No, the shoulder rig is not included with this Flowline model.

  • Is this model ideal for gimbal and dslr or should i get something with heavier weight capacity?

    This Flowline comes with three different weight capacities as mentioned below :
    - Flowline 300N: 5 - 8 kg (11 - 17.6 lb)
    - Flowline 400N: 8 - 10 kg (17.6 - 22 lb)
    - Flowline 500N: 10 - 12 kg (22 - 26.4 lb)

  • Can I use cage with this flowline?

    Yes, you can use a cage with this flowline.

  • Can I purchase extra spring of higher strength to change and use heavier camera with it?

    Yes, you can buy extra springs of higher strength to use for heavier camera setup.

  • For how long can I use it continuously?

    This Flycam Flowline system can be used for whole day without any fatigue.

  • Can I use the Flowline placid arm with this Flycam flowline?

    Yes, you can use the Flowline placid arm with this Flycam flowline model.

  • Does it come in bag packing?

    Yes, this Flycam Flowline comes in a bag packing for easy transportation.

  • What is the warranty?

    We provide 1 year warranty from the date of purchase Items which are covered by the warranty period will be replaced at no cost to the customer.Replacement parts of the product will be provided at nominal cost (covering the cost price of the replacement parts only) to the customers after the Warranty Period has expired.

  • The rugged rubber in the post behind his neck is a suspension system or is just a cover?

    The rubber section on the vertical bar behind the neck is not a suspension system. It is simply a protective cover that conceals the connection point between the upper and lower sections of the bar.

  • Is Flycam Flowline Edge Stabilization Arm is compatible with FLCM-FLN-500N Flowline system.

    Yes, Flycam Flowline Edge Stabilization Arm is compatible with FLCM-FLN-500N Flowline system.

Newsletter sign-up

You can subscribe without accepting optional cookies.

By selecting Subscribe, you agree to receive Proaim product updates and offers by email. You can unsubscribe at any time. Privacy policy

x

x