Flycam Flowline Starter for Camera & Gimbals (3-7.5 kg / 6-16 lb)
With 180° Rotation
AT A GLANCE
Vibration Reduction
Handheld Stabilization
Dynamic Camera Movement
Secure checkout | Fast delivery | 30-day returns | 1-year warranty
Secure checkout | Fast delivery | 30-day returns | 1-year warranty
Flycam Flowline StarterBody support rig
The Flycam Flowline Starter is a body support rig for camera and gimbal setups from 3 to 7.5 kg (6 to 16 lb). It takes the weight off your shoulders and arms, letting you hold the camera steady for longer duration without fatigue, resulting in smoother and steadier shots. The Top Bar with 180° Rotation capability allows easy camera movements in different angles, and the Support Rope adds an additional point of contact which reduces vibrations.
Flycam Flowline Starter
Body harness / Worn
01Comfort
We understand, extended handheld camerawork can prove to be a backbreaker. The Flycam Flowline takes the weight off your shoulders and arms and redistributes it across the entire back using the Comfortable and Breathable Body Harness.
Flycam Flowline Starter
180° rotation / In motion
02Stability
The Harness takes the weight off your arms and shoulder, letting you hold the camera steady for longer duration without fatigue, resulting in smoother and Steadier Shots. The Top Bar with 180° Rotation capability allows easy camera movements in different angles. The Support Rope also adds an additional point of Contact which reduces Vibrations.
Flycam Flowline Starter
Tension Adjustment Knob
03Versatility
This Flowline System has been designed to accommodate all Camera and Gimbal Setups between 3kg to 7.5kg (6lb / 16lb). The spring tension can be adjusted to balance the load placed on the Support Rope by turning the knob present on the back of the rig.
04Highlights
Carries the weight of your setup across your back.
Takes the weight off your shoulders and arms.
Easy camera movement at different angles.
An extra point of contact that reduces vibrations.
Accommodates camera and gimbal setups from 6 lb to 16 lb.
Adjusts the spring tension to balance the load on the support rope.
05Specifications
| Payload Capacity | Min - Max: 3kg - 7.5kg (6lb - 16lb)NOTE: Using Placid (FLCM-FLN-PLA) or Edge V1 (FLCM-EDGE-V1) with this Flowline model will impact the minimum and maximum payload capacities. |
|---|---|
| Support Arm Rotation | 180° |
| Flowline Weight | Complete 3.6kg / 8lb |
| Height | Mounted: 100cm | 39.4inch Folded: 64cm |
| Suspension Line | Material: 3mm Nylon Length (Rope): 152.5cm | 60inch When fully stretched |
| Top Bar | Length: 480mm Rotation: 180° |
| Waist hip strap length | Min-Max: 81cm - 125cm (32 inch - 49 inch) |
| Product Weight (Without Packing) | 3.8kg / 8.3lb |
| Product Volumetric Weight (With Packing) | 11.5kg / 25.4lb |
What camera weight can the Flycam Flowline Starter support?
The system supports camera and gimbal setups between 3kg and 7.5kg (6lb–16lb)
Can beginners use the Flycam Flowline Starter easily?
Yes, the system features simple spring tension adjustment and a straightforward setup suitable for beginners and professionals.
How is camera weight balanced on the Flowline Starter?
The spring tension knob on the back adjusts resistance to balance the camera weight suspended from the support rope.
Can the camera move freely while using the Flowline Starter?
Yes, the top bar features 180° rotation.
Can the Flycam Flowline Starter be used with gimbals?
Yes, the Flowline Starter supports most gimbals and camera rigs within the 3–7.5kg payload range.
What is the minimum camera weight required for proper operation?
A minimum setup weight of 3kg (6lb) is recommended to properly tension the balancing support rope.
what if I will use it with more weight (8kg or 9kg) than it supports? It's possible or what's the risks?
The weight capacity of B-FLCM-FLN-01 is 3-7.5 kg / 6-16 lb and would recommend to use the camera setup weight in this range to get the perfect and steadier shots.
If a customer has a 9-10 lb payload is there a way to adjust the tension so the camera does not keep pulling up?
Yes, the tension on the Flycam Flowline can be adjusted as shown in the below video:
https://www.youtube.com/watch?v=GC9uF0SXkz8&t=82s
What is the use of washers and Velcro you provide with the Flycam flowline starter? You have not shown any use of them.
Regarding your query on the washer and velcro, I would like to inform you that we provide an extra washer so that it can be used with the knob on the back mechanism of the flowline when required.
For Velcro, it is used to fasten the hook to the arm during packaging (when it is not in use). This prevents it from moving around and getting damaged.
What is the size and length of the marked knob of Basic Flowline Stabilizing Support Vest with 180¡?
M4 X 12MM